CaseDetails
    Summary
    Case ID
    11390
    Case Status
    Heritage Authority(s)
    Amafa
    Official Reference

    SAH18/12214

    Proposal Description
    The current water resources supplying the South Coast of KwaZulu-Natal are insufficient to meet the projected water demands. The Lower uMkhomazi Bulk Water Supply System (LUBWSS) is the recommended augmentation option for the existing Upper and Middle South Coast Supply area. Therefore, Umgeni Water proposed to construct the LUBWSS in order to increase the assurance of water supply. The Ngwadini weir, abstraction works and pipeline forms part of the LUBWSS and will be constructed to fill the Ngwadini Off-channel Storage Dam during summer periods of excess flow.
    Author
    nemai.consulting
    Last modified
    21/10/2023 - 12:33
    Reports
    Heritage Reports linked to this Case
    HIA Phase 1 Amended HIA -Lower Umkhomazi Bulk Water Supply System, KZN Len van Schalkwyk download
    HIA Phase 1 Ngwadini Weir and Abstraction Works HIA Jean Beater download
    Official
    Case Officers
      Location
      Location
      Decisions, Comments + Permits
      Decision Date Type
      Final Comment Access Document