CaseDetails
    Summary
    Case ID
    11448
    Case Status
    Heritage Authority(s)
    Amafa
    Proposal Description
    Tronox has started its mining operations at Fairbreeze, Mtunzini, KwaZulu-Natal. Several HIAs have been undertaken and the studies recommend monitoring of the mine during the operational phase. This permit excludes applications for buildings and grave removals, that will be undertaken separately. The permit is for sampling and excavation of archaeological sites that are uncovered during the mining process. Annual reports will be submitted.
    Author
    gavin.anderson
    Last modified
    21/10/2023 - 12:33
    Reports
    Heritage Reports linked to this Case
    AIA Phase 1 AIA of historic and contemporary structures in Fairbreeze district, Zululand Gavin Anderson download
    AIA Phase 1 AIA_Fairbreeze_Extension_C_Mine_Anderson_G_Apr04 Gavin Anderson, L Anderson download
    HIA Phase 1 Fairbreeze Mine Gavin Anderson download
    Built Environment and Cultural Landscapes Fairbreeze Mine - Reapplication for Built Environment permit Debbie Whelan download
    HIA Phase 1 HIA Of historic and contemporary structures on Siyayi 10011,Carlyle 9707, Enyezane 9470 , Baton Rouge 9667 and Highfield 9705 and Lot 100, Fairbreeze district, Zululand. Gavin Anderson download
    Archaeological Monitoring Ticor Fairbreeze Management Plan download, download
    Official
      Location
      Location