CaseDetails
    Summary
    Case ID
    13563
    Case Status
    Heritage Authority(s)
    SAHRA
    NBKB
    Proposal Description
    FINAL ENVIRONMENTAL MANAGEMENT PROGRAMME REPORT AND FINAL LAYOUT FOR THE AUTHORISED 140MW
    SUTHERLAND 2 WIND ENERGY FACILITY AND ASSOCIATED INFRASTRUCTURE, NORTHERN CAPE PROVINCE (DFFE
    REF: 12/12/20/1782/3) AND ASSOCIATED GRID CONNECTION (IPP PORTION OF THE 132KV ON-SITE SUBSTATION)
    INCLUDING THE 132KV OVERHEAD POWERLINE AND ESKOM PORTION OF THE ON-SITE SUBSTATION)
    Author
    Arlene.Singh
    Last modified
    23/10/2023 - 17:54
    Reports
    Heritage Reports linked to this Case
    Archaeological Specialist Reports Sutherland 2 WEF Archaeological Pre-Construction Walkthrough Report Jayson Orton download
    Palaeontological Specialist Reports Sutherland 2 WEF Palaeontological Pre-Construction Walkthrough Report John Almond download