CaseDetails
    Summary
    Case ID
    14018
    Case Status
    Heritage Authority(s)
    SAHRA
    HFS
    Proposal Description
    Matjhabeng 400 MW Solar PV Plant with 80 MW (320 MWh) BESS, which is located north and south of the town of Odendaalsrus in the Free State Province. Phase 1: 200MW PV with 40 MW (160 MWh) BESS on the Project site located south of Odendaalsrus (Property: Portion 2 of the Farm Kalkkuil 153). Phase 2: 200MW PV with 40 MW (160 MWh) BESS on the Project site located north of Odendaalsrus (Properties: Portion 0 of the Farm Dolly 404, Portion 0 of the Farm Ophir 405, Remaining Extent of the Farm Paleis-Heuvel 323, Portion 3 of the Farm Paleis-Heuvel 323).
    Author
    nemai.consulting
    Last modified
    23/10/2023 - 17:55
    Reports
    Heritage Reports linked to this Case
    HIA Phase 1 MATJHABENG SOLAR PHOTOVOLTAIC WITH BATTERY ENERGY STORAGE SYSTEMS PROJECT: PHASE 1 AND PHASE 2 POWER LINES Johnny van Schalkwyk download, download
    PIA Desktop Palaeontological Desktop Assessment Elize Butler download
    Official
      Location
      Location
      Decisions, Comments + Permits
      Decision Date Type
      Interim Comment Access Document
      Letter Access Document