CaseDetails
    Summary
    Case ID
    14545
    Case Status
    Heritage Authority(s)
    SAHRA
    HFS
    Official Reference

    15602

    Proposal Description
    SunElex Energy (Pty) Ltd (hereinafter “SunElex”) has proposed the development of the Matjhabeng 400 MW Solar Photovoltaic (PV) Plant with 80 MW (320 MWh) Battery Energy Storage System (BESS) (hereinafter the “Project”), which is located north and south of the town of Odendaalsrus in the Free State Province. The proposed Project will be developed to serve the Matjhabeng Local Municipality’s energy requirements and will generate power for delivery to the local/national grid. The electricity generated by the proposed Project will be injected into the existing Eskom 132 kV distribution system. Free State Province. Various properties traversed by proposed power lines.
    Author
    nemai.consulting
    Last modified
    23/10/2023 - 17:55
    Reports
    Heritage Reports linked to this Case
    PIA Phase 1 SITE SENSITIVITY VERIFICATION REPORT: PALAEONTOLOGICAL HERITAGE John Almond download
    Official
    Case Officers
      Location
      Location
      Decisions, Comments + Permits
      Decision Date Type
      Interim Comment Access Document