CaseDetails
    Summary
    Case ID
    15191
    Case Status
    Heritage Authority(s)
    SAHRA
    NBKB
    Proposal Description
    Mulilo Total Hydra Storage (Pty) Ltd (the Applicant’) is applying for environmental authorisation for a self-build, grid interconnection project scope of works, which will consist of an overhead powerline, switching station, busbar extension with feeder bay and access road (‘proposed development’) as part of the Mulilo Total Hydra Storage (MTHS) Project. The project os located 6 km south east of the town De Aar in the Northern Cape Province
    Author
    Arcus.Consulting
    Last modified
    23/10/2023 - 17:56
    Reports
    Heritage Reports linked to this Case
    Heritage Statement Heritage Statement: MTHS Grid Interconnection John Gribble download, download, download, download
    Site Inspection Report Walkthrough Report download