CaseDetails
    Summary
    Case ID
    15209
    Case Status
    Heritage Authority(s)
    HWC
    SAHRA
    NBKB
    Proposal Description
    The original Environmental Authorisation has authorised up to 67 wind turbines for the Modderfontein WEF with a total generating capacity of 201 MW using turbines with a generating capacity of up to 3 MW. The Applicant has proposed the following amendment to the existing Authorisation: Up to 25 wind turbines with a total generating capacity of 140 MW using turbines with a generating capacity of up to 5.6 MW. Please note the proposed development will be an approximately 67% reduction in turbine density which should at least maintain and possibly even reduce the impact levels as previously authorised.
    Author
    jenna.lavin
    Last modified
    21/10/2023 - 13:11
    Reports
    Heritage Reports linked to this Case
    AIA Phase 1 AIA_Karoo_Renewable_Binneman_J_Mar11 Johan Binneman, Celeste Booth, Natasha Higgitt download
    AIA Desktop AIA_Karoo_Renewable_Energy_Booth_C_Nov10 Celeste Booth, Natasha Higgitt download
    Heritage Scoping Heritage Screener: Modderfontein Amendment Jenna Lavin download, download
    HIA Phase 1 HIA: Modderfontein WEF Amendment Jenna Lavin, Nicholas Wiltshire, Sarah Winter, John Almond download, download, download, download, download, download, download, download
    Official
    Case Officers
      Location
      Location
      Decisions, Comments + Permits
      Decision Date Type
      Final Comment Access Document
      Interim Comment Access Document