The activity entails the development of a 132kV single-circuit power line to enable the connection of the authorised Sonvanger Photovoltaic Solar Power Plant (DFFE ref.: 14/12/16/3/3/2/672) to the national grid network. This will enable the evacuation of the generated solar electricity. A 200m wide and 22km long grid connection corridor is being assessed for the placement of the power line route. The power line is proposed to connect into the existing Oryx-Joel 132kV Line. A service road associated with the power line is also proposed to be developed.
The activity entails the development of a power line which will be single circuit and have a capacity of 132kV. The power line will connect to the existing Oryx-Joel 132kV Line via a loop-in loop-out connection and will enable the evacuation of the generated electricity from the authorised Sonvanger Photovoltaic Solar Power Plant. The project is proposed by Pele Green Energy (Pty) Ltd.
The activity entails the development of a power line which will be single circuit and have a capacity of 132kV. The power line will connect to the existing Oryx-Joel 132kV Line via a loop-in loop-out connection and will enable the evacuation of the generated electricity from the authorised Sonvanger Photovoltaic Solar Power Plant. The project is proposed by Pele Green Energy (Pty) Ltd.
Post date
03/08/2021 - 09:36
Last modified
23/10/2023 - 17:56
Reports
PIA Desktop | Desktop PIA: Sonvanger Powerline | Marion Bamford | download | |
HIA Letter of Exemption | Heritage Screener: Sonvanger Powerline | Jenna Lavin | download |
Official Use
Official
Case Officers
Location
Location
RoDs/Permits
Decisions, Comments + Permits
Decision Date | Type | |
---|---|---|
Final Comment | Access Document | |