CaseDetails
Summary
Case ID
15781
Case Status
Proposal Description
The activity entails the development of 132kV single-circuit power line to enable the connection of the authorised Grootpoort Photovoltaic Solar Power Plant (DFFE ref.: 14/12/16/3/3/2/835) to the national grid network. This will enable the evacuation of the generated solar electricity. A 200m wide and 8km long grid connection corridor is being assessed for the placement of the power line route. The power line is proposed to connect into the existing Canal Substation. A service road associated with the power line is also proposed to be developed.
The activity entails the development of a power line which will be single circuit and have a capacity of 132kV. The power line will connect to the existing Canal Substation and will enable the evacuation of the generated electricity from the authorised Grootpoort Photovoltaic Solar Power Plant. The project is proposed by Pele Green Energy (Pty) Ltd.
The activity entails the development of a power line which will be single circuit and have a capacity of 132kV. The power line will connect to the existing Canal Substation and will enable the evacuation of the generated electricity from the authorised Grootpoort Photovoltaic Solar Power Plant. The project is proposed by Pele Green Energy (Pty) Ltd.
Post date
03/08/2021 - 10:12
Last modified
23/10/2023 - 17:56
Reports
PIA Desktop | Desktop PIA: Grootpoort OHL | Marion Bamford | download | |
HIA Letter of Exemption | Heritage Screener: Grootpoort OHL | Jenna Lavin | download |
Official Use
Official
Case Officers
Location
Location
RoDs/Permits
Decisions, Comments + Permits
Decision Date | Type | |
---|---|---|
Final Comment | Access Document |