CaseDetails
    Summary
    Case ID
    15816
    Case Status
    Heritage Authority(s)
    SAHRA
    HFS
    Proposal Description
    South Africa Mainstream Renewable Power Developments (Pty) Ltd is proposing the construction and operation of the grid connection infrastructure for the proposed 100 MWac Vrede Solar Energy Facility (SEF), Battery Energy Storage System (BESS) and associated infrastructure located near the town of Kroonstad in the Moqhaka Local Municipality (Fezile Dabi District) of the Free State Province of South Africa. The proposed development traverses three (3) farm parcels namely:
    Farm Vrede, No. 1152, Remaining Extent;
    Farm Gesukkel, No. 1153, Remaining Extent;
    Farm Geduld No. 1156, Remaining Extent.
    Author
    jenna.lavin
    Last modified
    21/10/2023 - 13:15
    Reports
    Heritage Reports linked to this Case
    HIA Phase 1 HIA: Vrede PV EGI Jenna Lavin download
    Official
    Case Officers
      Location
      Location
      Decisions, Comments + Permits
      Decision Date Type
      Final Comment Access Document
      Final Comment Access Document