CaseDetails
Summary
Case ID
15965
Case Status
Proposal Description
Genesis Eco-Energy Developments is proposing grid connection infrastructure to connect the authorised Woodhouse 1 and Woodhouse 2 PV facilities to the Eskom grid. The project includes the following:
1 x collector substations (one at Woodhouse 1 (2 alternatives)) and 1 switching station at Woodhouse 2
1 x 132kV overhead line
Connection from Woodhouse 1 substation to Bophirima Substation
1 x collector substations (one at Woodhouse 1 (2 alternatives)) and 1 switching station at Woodhouse 2
1 x 132kV overhead line
Connection from Woodhouse 1 substation to Bophirima Substation
Post date
10/09/2021 - 09:06
Last modified
23/10/2023 - 17:57
Reports
HIA Phase 1 | HIA: Woodhouse PV 1 and 2 Grid Connection | Jenna Lavin, William Archer | download, download | |
Palaeontological Specialist Reports | PIA-WoodhousePV1&PV2 | Elize Butler | download |
Official Use
Official
Case Officers
Location
Location
RoDs/Permits
Decisions, Comments + Permits
Decision Date | Type | |
---|---|---|
Final Comment | Access Document |