CaseDetails
Summary
Case ID
16026
Case Status
Official Reference
21/195
Proposal Description
Construct a second room and a kitchen, toilet ,lounge to ground floor.
Construct a first floor to existing outbuilding.
Turn main building veranda into en-suite for main bedroom.
Proposed alteration to 16 Joubert Place, Bellair ,Durban
Construct a first floor to existing outbuilding.
Turn main building veranda into en-suite for main bedroom.
Proposed alteration to 16 Joubert Place, Bellair ,Durban
Inventory Reference
Post date
20/09/2021 - 12:01
Last modified
21/10/2023 - 13:16