CaseDetails
    Summary
    Case ID
    16027
    Case Status
    Heritage Authority(s)
    SAHRA
    LIHRA
    Proposal Description
    The proposed power line is approximately 377.70m long. The line will be built on Stateland at Zwigodini Village which is under the jurisdiction of Musina Local Municipality, Vhembe District, Limpopo Province. The line will T-off from the existing power line at pole number SMI32A/255/82.
    Author
    tshifhiwa.matamela
    Last modified
    21/10/2023 - 13:16
    Official
    Case Officers
      Location
      Location