CaseDetails
    Summary
    Case ID
    16239
    Case Status
    Heritage Authority(s)
    HWC
    SAHRA
    NBKB
    Proposal Description
    The development of a 132kV overhead power line to connect the Karreebosch Wind Energy Facility (WEF) Energy Facility to the national grid via the existing Eskom Komsberg substation. The powerline is approximately 20 km long. The project is situated north of the town of Matjiesfontein in the Karoo Hoogland Local Municipality and the Laingsburg Local Municipality in the Northern Cape Province and Western Cape Province. The 132kV grid connection crosses the following properties:
    Wilgebosch Rivier 188 Remainder
    Ekkraal (Nuwekraal) 199 Portion 2
    Klipbanksfontein 198 Portion 1 and Remainder
    Bon Espirange 73 Portion 1 and Remainder
    Rietfontein 197
    Ekkraal (Nuwekraal) 199 Portion 1 and Remainder
    Standvastigheid 210 Portion 2 (Komsberg Substation)

    The OHL will be a 132kV steel single or double structure with kingbird conductor (between 15 and 20m in height – above ground level). Standard overhead line construction methodology will be employed – drill holes (typically 2 – 3m in depth), plant poles, string conductor. It is not envisage that any large excavations and stabilized backfill will be required however this will only be verified on site once the Geotech has been undertaken at each pole position (part of construction works).

    Linked to CASE 17682 AND 19355
    Author
    jenna.lavin
    Last modified
    21/10/2023 - 13:21
    Reports
    Heritage Reports linked to this Case
    Heritage Scoping Heritage Screener: Karreebosch WEF Grid Connection Jenna Lavin download
    Official
    Case Officers
      Location
      Location
      Decisions, Comments + Permits
      Decision Date Type
      Final Comment Access Document
      Interim Comment Access Document