CaseDetails
    Summary
    Case ID
    16296
    Case Status
    Heritage Authority(s)
    ECPHRA
    Proposal Description
    The Haga Haga Wind Energy Facility (WEF) was authorised on 5/07/2019 (DFFE Reference: 14/12/16/3/3/2/1087). The Environmental Authorisation (EA) received an amendment on 03/06/2021 (DFFE Reference: 14/12/16/3/3/2/1087/AM1). The original EIA included a 42 turbine layout and associated internal road network, the amendment reduced the number of turbines to 36 and the internal road network was changed to match this. The internal road layout will be built as per the layout submitted during the amendment, within allowable micro siting limits. The WEF has not yet been constructed.

    Several of the site access points will require upgrades on farm portions which were not included in the previous applications. Haga Haga Wind Farm (RF) (Pty) Ltd. (the Applicant), is therefore proposing to upgrade the existing roads leading to the access points, which will link up with the approved WEF internal road layout to allow for access to the site for construction and operation purposes.
    Author
    Robyn.Thomson1
    Last modified
    23/10/2023 - 17:57
    Reports
    Heritage Reports linked to this Case
    PIA Desktop CCESS ROAD UPGRADES FOR THE AUTHORISED HAGA HAGA WIND ENERGY FACILITY John Almond download
    Heritage Statement Haga Haga WEF access roads - archaeological statement download
      Location
      Location