CaseDetails
Summary
Case ID
16585
Case Status
Proposal Description
Background
Vetlaagte Farm consists of 3x PV farms of which Environmental Authorisation was obtained in 2012/14
The 3x PV farms will each have a Switching Station as well as a grid connection connecting the PV farm to the new MTS
The new MTS will connect via Loop In Loop Out (LILO) power lines to an existing 400kV power line
Project components and areas for assessment
3x grid connections WITH A 200M CORRIDOR
3x switching stations (note that the Switching Stations fall within the 200m corridor)
Main Transmission Substation – note that there are two site alternatives within the assessment area. These alternative sites need to be assessed and other sites recommended should these sites not be suitable.
LILO lines to connect the MTS to the existing 400kV lines
The entire assessment area (as per info provided for quoting purposes) needs to be investigated and no go areas demarcated.
General
The grid connections connecting PV1 and PV2 are running adjacent to each other and to the direct east of an existing 132kV line (the existing line is in red in the map below)
The PV3 grid connection and switching station are situated within the assessment area.
Vetlaagte Farm consists of 3x PV farms of which Environmental Authorisation was obtained in 2012/14
The 3x PV farms will each have a Switching Station as well as a grid connection connecting the PV farm to the new MTS
The new MTS will connect via Loop In Loop Out (LILO) power lines to an existing 400kV power line
Project components and areas for assessment
3x grid connections WITH A 200M CORRIDOR
3x switching stations (note that the Switching Stations fall within the 200m corridor)
Main Transmission Substation – note that there are two site alternatives within the assessment area. These alternative sites need to be assessed and other sites recommended should these sites not be suitable.
LILO lines to connect the MTS to the existing 400kV lines
The entire assessment area (as per info provided for quoting purposes) needs to be investigated and no go areas demarcated.
General
The grid connections connecting PV1 and PV2 are running adjacent to each other and to the direct east of an existing 132kV line (the existing line is in red in the map below)
The PV3 grid connection and switching station are situated within the assessment area.
Post date
12/01/2022 - 09:22
Last modified
23/10/2023 - 17:57
Reports
Heritage Impact Assessment Specialist Reports | Addemdum: Vetlaagte Heritage | Jenna Lavin | download | |
AIA Phase 2 | Detailed Site Recording at 34471 | Nicholas Wiltshire | download | |
Heritage Scoping | Heritage Screener: Vetlaagte Infrastructure | Jenna Lavin | download | |
HIA Letter of Exemption | Heritage Screener: Vetlaagte Supplementary Report | Jenna Lavin | download | |
HIA Phase 1 | HIA: Vetlaagte Grid Infrastructure | Jenna Lavin, Nicholas Wiltshire | download, download, download, download |
Official Use
Official
Case Officers
Location
Location
RoDs/Permits
Decisions, Comments + Permits
Decision Date | Type | |
---|---|---|
Letter | Access Document | |
Final Comment | Access Document | |
Interim Comment | Access Document |