    Proposal Description
    South African National Roads Agency SOC Limited’s (SANRAL) proposed capacity improvements to existing sections of the R103 road in KwaZulu-Natal. The upgrades to the R103 are required because of structural damage to the existing road surface. The total distance for the proposed R103 upgrades, including the new link road between the Camperdown Interchange and Camperdown overpass, will be approximately 3,9 km with a road reserve of 40 m.
    Author
    Shelton.Tsanga
    Last modified
    23/10/2023 - 17:57
    Reports
    Heritage Reports linked to this Case
    HIA Phase 1 HIA R103 Road upgrades Polke Birkholtz download
    PIA Phase 1 PIA - R103 Road upgrades Elize Butler download