CaseDetails
    Summary
    Case ID
    16707
    Case Status
    Heritage Authority(s)
    SAHRA
    NWPHRA
    Proposal Description
    The Applicant is planning to install additional pipeline infrastructure to meet the planned Life of Mine (LOM) production
    rates and increase the volume of return water from Kareerand TSF to the reclamation pump stations. The current slurry
    and return water infrastructure fail to meet the requirements of the planned LOM and impacts on the long-term
    sustainability of the MWS operations. The proposed new infrastructure is considered an upgrade and expansion of the
    existing reclamation pipeline infrastructure and is as follows:
    • An additional 750mm diameter return water pipeline along the existing pipeline route from Kareerand TSF to
    Midway Dam; and
    • The installation of a new 6.2km slurry pipeline from Midway Dam towards the MWS Plant. The new pipeline
    will be installed alongside the existing pipelines and tie-in made upon commissioning whereafter the existing
    pipeline will be repurposed to a process water line.
    The proposed project site is located in City of Matlosana, North West Province, South Africa
    Author
    cheyenne.muthu…
    Last modified
    21/10/2023 - 13:23
    Reports
    Heritage Reports linked to this Case
    Heritage Impact Assessment Specialist Reports 1469_HIA Nikki Mann download
    1469_PIA Elize Butler download
    Official
    Case Officers
      Location
      Location
      Decisions, Comments + Permits
      Decision Date Type
      Final Comment Access Document