CaseDetails
    Summary
    Case ID
    16768
    Case Status
    Heritage Authority(s)
    SAHRA
    HFS
    Proposal Description
    The proposed development is primarily a linear development and includes the construction of two new substations located at each end of the grid connection line. A combined switching station and high voltage substation on the Farm Visserspan 40 will serve as the collection point for electricity generated from the proposed Visserspan Solar PV Facility.
    Author
    jonathan.kaplan
    Last modified
    23/10/2023 - 17:57
    Reports
    Heritage Reports linked to this Case
    AIA Phase 1 Phase 1 AIA Proposed Visserspan Grid Connection Jonathan Kaplan download