Mokala Manganese Mine intends constructing a water pipeline to link to the Sedibeng (Municipal) water supply. The planned pipeline is shown in the attached map and is located within Mokala Mining Right (MR) area as well as the adjacent Black Rock Mining Operation (BRMO) MR area. The pipeline details are as follows:
- Maximum length: 3650m
- Depth: 1m
- Dimensions: 4” HDPE PN16 pipe
- Throughput: 10.42-20.8l/min
- Servitude: Culvert under the R380 road– dimensions shown in the layout
- Volumes to be taken from Sedibeng: 15-30kL per day in steady state
Both BRMO and Mokala have undertaken previous heritage impact assessments covering their mining right areas. The identified heritage features in the area are shown on the attached map and none of these features are in close proximity to the proposed water pipeline.
It is understood that no additional infrastructure to the pipeline is required and that no laydown or construction campsites will be established in relation to this pipeline.
We hereby notify the SAHRA in terms of Section 38(1) of the NHRA and respectfully request confirmation that no additional heritage impact assessments etc. are required for the purposes of constructing the pipeline?
- Maximum length: 3650m
- Depth: 1m
- Dimensions: 4” HDPE PN16 pipe
- Throughput: 10.42-20.8l/min
- Servitude: Culvert under the R380 road– dimensions shown in the layout
- Volumes to be taken from Sedibeng: 15-30kL per day in steady state
Both BRMO and Mokala have undertaken previous heritage impact assessments covering their mining right areas. The identified heritage features in the area are shown on the attached map and none of these features are in close proximity to the proposed water pipeline.
It is understood that no additional infrastructure to the pipeline is required and that no laydown or construction campsites will be established in relation to this pipeline.
We hereby notify the SAHRA in terms of Section 38(1) of the NHRA and respectfully request confirmation that no additional heritage impact assessments etc. are required for the purposes of constructing the pipeline?
Post date
18/02/2022 - 14:05
Last modified
21/10/2023 - 13:23
Reports
HIA Phase 1 | 1458_HIA Mokala | Jaco van der Walt | download | |
PIA Phase 1 | 1458_PIA Mokala | Marion Bamford | download | |
Mokala heritage assessment | Wouter Fourie | download | ||
PIA Desktop | PALAEONTOLOGICAL DESKTOP ASSESSMENT FOR THE PROPOSED UPDATED ENVIRONMENTAL MANAGEMENT PROGRAMME (EMPr) FOR THE ASSMANG (PTY) LTD BLACK ROCK MINING OPERATIONS, HOTAZEL, NORTHERN CAPE: | Elize Butler | download | |
PIA Desktop | PIA: Wessels Mine Railway Extension | Marion Bamford | download | |
AIA Phase 1B | STONE AGE SITES AT THE BLACK ROCK MINING OPERATIONS | Anton van Vollenhoven | download |
Official Use
Official
Case Officers
Location
Location
RoDs/Permits
Decisions, Comments + Permits
Decision Date | Type | |
---|---|---|
Final Decision | Access Document |