    Case ID
    16849
    Case Status
    Heritage Authority(s)
    Amafa
    SAHRA
    Official Reference

    SAH21/18055

    Proposal Description
    Ugu District Municipality proposes to install a 1.6km gravity main pipeline as well as an 8.6km reticulation pipeline to connect to the existing reticulation in Bazini Heights which will supplement the current water supply from the existing Kwajali Reservoir to cater to current and future demands. Unauthorized Work commenced includes: The clearance of 11200 m2 of vegetation, digging of trenches and the installation of a section of the pipeline.
    Author
    jean.beater
    Last modified
    21/10/2023 - 13:23
    Reports
    Heritage Reports linked to this Case
    HIA Phase 1 Bazini Heights bulk water pipeline project Jean Beater download, download, download
      Location
      Location
      Decisions, Comments + Permits
      Decision Date Type
      Final Decision Access Document