CaseDetails
Summary
Case ID
17091
Case Status
Proposal Description
The proposed new 90km 132 kV transmission line will run from the Grassridge substation to Skilpad and Wolf substations alongside, as far as possible, the existing 132 kV transmission line (to be decommissioned in future).
Post date
08/04/2022 - 10:42
Last modified
23/10/2023 - 17:58
Reports
AIA Phase 1 | HIA: Wolf-Skillpad-Grassridge 132kV Transmission Line | Kobus Reichert | download | |
PIA Phase 2 | PIA: Wolf-Skillpad-Grassridge 132kV Transmission Line | Marion Bamford | download |