CaseDetails
    Summary
    Case ID
    17091
    Case Status
    Heritage Authority(s)
    ECPHRA
    Proposal Description
    The proposed new 90km 132 kV transmission line will run from the Grassridge substation to Skilpad and Wolf substations alongside, as far as possible, the existing 132 kV transmission line (to be decommissioned in future).
    Author
    patrick.killick
    Last modified
    23/10/2023 - 17:58
    Reports
    Heritage Reports linked to this Case
    AIA Phase 1 HIA: Wolf-Skillpad-Grassridge 132kV Transmission Line Kobus Reichert download
    PIA Phase 2 PIA: Wolf-Skillpad-Grassridge 132kV Transmission Line Marion Bamford download
      Location
      Location