CaseDetails
    Summary
    Case ID
    17229
    Case Status
    Heritage Authority(s)
    SAHRA
    LIHRA
    Proposal Description
    Eskom Holdings SOC Limited’s Limpopo Operating Unit (LOU) intends to construct the power line for the above-mentioned project. The power line l include new 0.851 KM LV and 0.235 KM MV powerline which will T-off from various points on the existing MV powerline. These points include the following HR96/26A/10A, HR96/14B/15A/13 and HR100A/19(refer to the Span plan and the pegging coordinate spreadsheet). The project will be built on Farm Zonkebloem 105 LT which is under jurisdiction of Makhado Local Municipality , Limpopo Province.
    Author
    tshifhiwa.matamela
    Last modified
    18/10/2023 - 15:43