Applicant: Enel Green Power South Africa (Pty) Ltd
Proposed Activity: The development of a Battery Energy Storage System (BESS) and associated infrastructure. Infrastructure associated with the project will include the following:
» A BESS with a capacity of up to 2 000 MWh inside containers with a footprint of up to 6ha in extent and a maximum height of 3m. Both lithium-ion and Redox-flow technology are being considered for the project, depending on which is most feasible at the time of implementation.
» Access roads to the BESS (10m in width, approximately 70m long) branching off to the existing roads, and internal roads (up to 8m wide) to be located within the total BESS footprint area.
» 33kV MV cabling between the BESS and the MV/HV substation and up to 132kV HV cabling to the HV substation
» Fencing around the BESS for increased security measures.
» Up to 132kV overhead or underground power line to be connected to the existing Hidden Valley Substation.
» Temporary laydown area to be located within the BESS footprint.
» Firebreak to be located within the BESS footprint.
» Substation Max Height - HV bus-bar up to10 m max - HV Building up to 4 m max
Project Location: ~45km south of the town of Sutherland, on Portion 0 of Farm De Hoop 202, within the jurisdiction of the Karoo Hoogland Local Municipality and the Namakwa District Municipality in the Northern Cape Province.
Proposed Activity: The development of a Battery Energy Storage System (BESS) and associated infrastructure. Infrastructure associated with the project will include the following:
» A BESS with a capacity of up to 2 000 MWh inside containers with a footprint of up to 6ha in extent and a maximum height of 3m. Both lithium-ion and Redox-flow technology are being considered for the project, depending on which is most feasible at the time of implementation.
» Access roads to the BESS (10m in width, approximately 70m long) branching off to the existing roads, and internal roads (up to 8m wide) to be located within the total BESS footprint area.
» 33kV MV cabling between the BESS and the MV/HV substation and up to 132kV HV cabling to the HV substation
» Fencing around the BESS for increased security measures.
» Up to 132kV overhead or underground power line to be connected to the existing Hidden Valley Substation.
» Temporary laydown area to be located within the BESS footprint.
» Firebreak to be located within the BESS footprint.
» Substation Max Height - HV bus-bar up to10 m max - HV Building up to 4 m max
Project Location: ~45km south of the town of Sutherland, on Portion 0 of Farm De Hoop 202, within the jurisdiction of the Karoo Hoogland Local Municipality and the Namakwa District Municipality in the Northern Cape Province.
Post date
23/05/2022 - 09:09
Last modified
23/10/2023 - 17:58
Reports
HIA Phase 1 | Heritage Screening Impact Assessment (FBAR) | Jenna Lavin | download | |
Heritage Screening Impact Assessment Karusa BESS | Jenna Lavin | download |
Official Use
Official
Case Officers
Location
Location
RoDs/Permits
Decisions, Comments + Permits
Decision Date | Type | |
---|---|---|
Final Comment | Access Document |