    Applicant: Enel Green Power South Africa (Pty) Ltd
    Proposed Activity: The development of a Battery Energy Storage System (BESS) and associated infrastructure. Infrastructure associated with the project will include the following:

    » A BESS with a capacity of up to 2 000 MWh inside containers with a footprint of up to 6ha in extent and a maximum height of 3m. Both lithium-ion and Redox-flow technology are being considered for the project, depending on which is most feasible at the time of implementation.
    » Access roads to the BESS (10m in width, approximately 70m long) branching off to the existing roads, and internal roads (up to 8m wide) to be located within the total BESS footprint area.
    » 33kV MV cabling between the BESS and the MV/HV substation and up to 132kV HV cabling to the HV substation
    » Fencing around the BESS for increased security measures.
    » Up to 132kV overhead or underground power line to be connected to the existing Hidden Valley Substation.
    » Temporary laydown area to be located within the BESS footprint.
    » Firebreak to be located within the BESS footprint.
    » Substation Max Height - HV bus-bar up to10 m max - HV Building up to 4 m max
    Project Location: ~45km south of the town of Sutherland, on Portion 0 of Farm De Hoop 202, within the jurisdiction of the Karoo Hoogland Local Municipality and the Namakwa District Municipality in the Northern Cape Province.
    Author
    savannahsa
    Last modified
    23/10/2023 - 17:58
    Reports
    Heritage Reports linked to this Case
    HIA Phase 1 Heritage Screening Impact Assessment (FBAR) Jenna Lavin download
    Heritage Screening Impact Assessment Karusa BESS Jenna Lavin download
    Official
    Case Officers
      Location
      Location
      Decisions, Comments + Permits
      Decision Date Type
      Final Comment Access Document