CaseDetails
    Summary
    Case ID
    17526
    Case Status
    Heritage Authority(s)
    Amafa
    SAHRA
    Official Reference

    SAH22/18818

    Proposal Description
    The eThekwini Metropolitan Municipality has proposed constructing a pedestrian bridge across the Sipingo River, between How Long Place and 109409 Street. The proposed site falls within Umlazi, in Ward 86 of the eThekwini Municipality. The bridge will be constructed downstream and parallel to existing pipelines.
    Author
    EnviroPro
    Last modified
    23/10/2023 - 17:58
    Reports
    Heritage Reports linked to this Case
    AIA Desktop How Long bridge desktop HIA Gavin Anderson download
    HIA Letter of Exemption How Long bridge HIA desktop Gavin Anderson download
    Official
      Location
      Location