CaseDetails
Summary
Case ID
17526
Case Status
Official Reference
SAH22/18818
Proposal Description
The eThekwini Metropolitan Municipality has proposed constructing a pedestrian bridge across the Sipingo River, between How Long Place and 109409 Street. The proposed site falls within Umlazi, in Ward 86 of the eThekwini Municipality. The bridge will be constructed downstream and parallel to existing pipelines.
Post date
15/06/2022 - 16:10
Last modified
23/10/2023 - 17:58
Reports
AIA Desktop | How Long bridge desktop HIA | Gavin Anderson | download | |
HIA Letter of Exemption | How Long bridge HIA desktop | Gavin Anderson | download |
Official Use
Official
Case Officers