CaseDetails
    Summary
    Case ID
    17620
    Case Status
    Heritage Authority(s)
    SAHRA
    NWPHRA
    Proposal Description
    The Applicant, Voltalia South Africa (Pty) Ltd, is proposing the construction of a photovoltaic (PV) solar energy facility (known as the Kiara PV 2 facility) located on a site approximately 16km north east of the town of Lichtenburg in the North West Province. The solar PV facility will comprise several arrays of PV panels and associated infrastructure and will have a contracted capacity of up to 100MW. The development area is situated within the Ditsobotla Local Municipality within the Ngaka Modiri Molema District Municipality. The site is accessible via an existing gravel road which provides access to the development area.
    The development area for the PV facility and associated infrastructure will be located on Portion 2 of the Farm Hollaagte No. 8
    Six additional PV facilities (Kiara PV 1, Kiara PV 3, Kiara PV 4, Kiara PV 5, Kiara PV 6, Kiara PV 7) are concurrently being considered on the project site (within Portion 2 of the Farm Hollaagte 8 and the Remaining Extent of the Farm Hollaagte No. 8) and are assessed through separate Environmental Impact Assessment (EIA) processes.
    A facility development area (approximately 169ha) as well as grid connection solution have been considered in the Scoping phase. The infrastructure associated with this PV facility includes:
    PV modules and mounting structures
    Inverters and transformers
    Battery Energy Storage System (BESS)
    Site and internal access roads (up to 8m wide)
    Site offices and maintenance buildings, including workshop areas for maintenance and storage.
    Temporary and permanent laydown area
    Grid connection solution will include:
    Facility Substation
    Eskom Switching Station
    A 275kV powerline (16.6km in length) (either single or double circuit), to connect the PV facility to the Watershed MTS. The 132kV powerline from the on-site substation to the collector substation is approximately 1.2 km long.
    Author
    jenna.lavin
    Last modified
    23/10/2023 - 17:58
    Reports
    Heritage Reports linked to this Case
    Heritage Scoping Heritage Screener: Kiara PV 2 Jenna Lavin download
    HIA Phase 1 HIA: Kiara PV 2 Jenna Lavin download
    Official
    Case Officers
      Location
      Location
      Decisions, Comments + Permits
      Decision Date Type
      Final Comment Access Document
      Interim Comment Access Document