CaseDetails
Summary
Case ID
17735
Case Status
Proposal Description
The activities entail the development of photovoltaic solar facility and associated infrastructure on Portion 1 of Farm Merriesfontein 1725, Registration Division Boshof, Free State Province situated within the Tokologo Local Municipality area of jurisdiction. The town of Boshof is located approximately 2 km northwest of the proposed development.
The project entails the generation of up to 20MW electrical power through photovoltaic (PV) panels. The total footprint of the project will be approximately 40 hectares (including supporting infrastructure on site). The property on which the facility is to be constructed will be leased by Castor Solar PV Project (Pty) Ltd from the property owner, for the lifespan of the project (minimum of 20 years).
The project entails the generation of up to 20MW electrical power through photovoltaic (PV) panels. The total footprint of the project will be approximately 40 hectares (including supporting infrastructure on site). The property on which the facility is to be constructed will be leased by Castor Solar PV Project (Pty) Ltd from the property owner, for the lifespan of the project (minimum of 20 years).
Post date
14/07/2022 - 12:55
Last modified
21/10/2023 - 13:26
Reports
Castor PV HIA | download | |||
Castor PV PIA | download |
Official Use
Official
Case Officers
Location
Location
RoDs/Permits
Decisions, Comments + Permits
Decision Date | Type | |
---|---|---|
Letter | Access Document | |
Final Comment | Access Document | |
Interim Comment | Access Document |