CaseDetails
Summary
Case ID
17869
Case Status
Official Reference
SAH22/19188
Proposal Description
The eThekwini Municipality Coastal, Stormwater and Catchment Department is proposing to construct a new stormwater box canal to outfall in the eastern Prospecton area in order to reduce the risk of flooding on the N2 highway and in the Isipingo area, as well as flooding of the car manufacturer, Toyota, during storm events. The proposed culvert will be 751m in length, with a height of 1.5m by 2m width.
Post date
02/08/2022 - 09:27
Last modified
21/10/2023 - 13:26
Reports
HIA Phase 1 | Toyota stormwater culvert to outfall, Prospecton | Jean Beater | download, download |
Official Use
Official
Case Officers
Location
Location
RoDs/Permits
Decisions, Comments + Permits
Decision Date | Type | |
---|---|---|
Final Comment | Access Document |