CaseDetails
    Summary
    Case ID
    18407
    Case Status
    Heritage Authority(s)
    SAHRA
    LIHRA
    Official Reference

    19768

    Proposal Description
    Letsatsi PV (Pty) Ltd proposes the construction and operation of a Solar Photovoltaic (PV) Energy Facility and associated infrastructure on Portion 1 of the Farm Kopje Alleen 422KQ, located approximately 35km south of Thabazimbi and 18km northwest of Northam, between the R510 in the west and the R511 in the east in the Thabazimbi Local Municipality and Waterberg District in the Limpopo Province. Infrastructure associated with the Solar PV Energy Facility will include the following:
    Solar PV array, comprising PV modules and mounting structures.
    Inverters and transformers.
    Cabling between the project components.
    A 33kV on-site facility substation to facilitate the connection between the Solar PV Energy Facility and mine electrical distribution system.
    Offices, control room/s and a storage facility.
    3 x 33kV overhead power lines for the distribution of the generated power, which will be connected to the existing smelter substation, shaft substation and 3# substation.
    Temporary laydown areas.
    Access road (paved/gravel), internal gravel roads and fencing around the development area.
    Author
    jenna.lavin
    Last modified
    26/04/2024 - 10:36
    Reports
    Heritage Reports linked to this Case
    Heritage Statement Heritage Screener: Zondereinde PV Jenna Lavin download
    HIA Phase 1 HIA: Northam Mine PV Jenna Lavin, Nicholas Wiltshire download
    Official
    Case Officers
      Location
      Location
      Decisions, Comments + Permits
      Decision Date Type
      Interim Comment Access Document
      Final Comment Access Document