CaseDetails
    Summary
    Case ID
    18440
    Case Status
    Heritage Authority(s)
    SAHRA
    NBKB
    Proposal Description
    The proposed Sishen Expansion Project at SIOM comprises of further pit expansions that include Far south pushback 21 and 19, Lylyveld pit expansion, C&G stockpile at Far south and Lylyveld pit, Moolmans workshop, access road and pollution control dam, proposed Far south Waste Rock Dump, heavy and light vehicle crossing, expansion of the existing tyre storage area, heavy mining equipment Parkup area, proposed haul roads, and associated mining infrastructure, proposed rerouting of telephone line, powerline and pipelines.
    Author
    Lee-Anne.Fellowes
    Last modified
    23/10/2023 - 17:59
    Reports
    Heritage Reports linked to this Case
    Site Inspection Report 2023 Addendum HIA Siegwalt Udo Kusel download
    HIA Phase 1 Addendum 10 Siegwalt Udo Kusel download
    PIA Desktop Desktop Paleontological study Bruce Rubidge download
    Site Inspection Report Sishen Expansion Project Siegwalt Udo Kusel download, download
    Official
    Case Officers
      Decisions, Comments + Permits
      Decision Date Type
      Final Comment Access Document
      Interim Comment Access Document
      Interim Comment Access Document