    Summary
    Case ID
    18625
    Case Status
    Heritage Authority(s)
    SAHRA
    MPHRA
    Proposal Description
    The proposed activities entails the construction of stormwater drainage and associated infrastructure at the overland conveyor and near the radial stacker at the Kusile Power Station. The following infrastructure is proposed, viz, stormwater collection channels, Overland Conveyor (OLC) 1&2 collection sump with a working capacity of 125m3 , the East Settling Tanks (EST) comprising of two compartments and a pump sump with a total storage capacity of 5394.3m3, two 250NB interconnecting pipelines (Length = 45m each) from the OLC 1&2 sump to the EST, a 300mm diameter above ground steel pipeline to transfer clarified water from the east settling tank pump sump to the ash dump dirty water drain (Total Length - 688m), the West Settling Tanks (WST) comprising of two compartments and a pump sump with a total storage capacity of 1270.2m3, a 200mm diameter overland steel pipeline to transfer clarified water from the west settling tank pump sump to the ash dump dirty water drain (Total Length - 178m) and groundwater interception drains will also be installed underneath east and west settling tank foundations with groundwater drains draining to the wetland. A gravel access road (169m in length and 6m wide) will be constructed from the sump to the EST. Mpumalanga.
    Author
    natasha.lalie
    Last modified
    23/10/2023 - 17:59
    Reports
    Heritage Reports linked to this Case
    HIA Letter of Exemption Kusile Stormwater Exemption Letter for HIA Wouter Fourie download, download
    Palaeontological Specialist Reports Palaeontological Impact Assessment_Kusile Stormwater Infrastructure Elize Butler download
    Official
    Case Officers
      Location
      Location
      Decisions, Comments + Permits
      Decision Date Type
      Final Comment Access Document