CaseDetails
Summary
Case ID
18631
Case Status
Proposal Description
Eskom Holdings SOC Ltd, Limpopo Operating Unit (LOU) intends to construct the power line for through Roodeport farm . The power line will be approximately 1463m which will be connected to Selonsrivier Rural 22KV. Environmental Screening of the power line route was conducted during the pegging of the route by the Survey team and site verification by Environmental Practitioner which lead to the generation of the servitude planning documents [Distribution Environmental Screening Document (DESD), Wayleave, Span plan and Pegging coordinates attached for your reference].
No Heritage resources outlined on item 6.3 of the DESD were observed on site. The project area is is a farming area.
No Heritage resources outlined on item 6.3 of the DESD were observed on site. The project area is is a farming area.
Post date
09/11/2022 - 20:02
Last modified
21/10/2023 - 13:28