CaseDetails
    Summary
    Case ID
    18711
    Case Status
    Heritage Authority(s)
    SAHRA
    HFS
    Proposal Description
    The activity entails the development of grid connection infrastructure which consists of 132kV single/double-circuit overhead power line (with the associated infrastructure) to enable the connection and evacuation of the generated electricity of the proposed Lengana Solar Power Plant, to the national grid network. A 100m wide and 5km long grid connection corridor is being assessed for the placement of the power line route. The power line is proposed to connect into the existing Merapi Substation. A service road associated with the power line is also proposed to be developed. The grid connection corridor is approximately 1km south of the town of Excelsior and falls within the Mantsopa Local Municipality of the Thabo Mofutsanyana District Municipality, Free State Province (refer to the attached locality map).
    Various properties are affected by the grid connection corridor, which includes:
    The farms Ceylon No. 311 (Remaining Extent & Portion 2), Bluffpoint No. 327, (Remaining Extent & Portion 1), Concordia No. 374, Welgegund No. 1623 and Moeders Gift No. 566 (Remaining Extent).
    Author
    carli.steenkamp
    Last modified
    13/09/2024 - 11:11
    Reports
    Heritage Reports linked to this Case
    Heritage Impact Assessment Specialist Reports Phase 1 Cultural Heritage Impact Assessment: Johan Abraham download
    Official
      Location
      Location
      Decisions, Comments + Permits
      Decision Date Type
      Final Comment Access Document
      Interim Comment Access Document
      Interim Comment Access Document
      Interim Comment Access Document