CaseDetails
    Summary
    Case ID
    19458
    Case Status
    Heritage Authority(s)
    Amafa
    Official Reference

    SAH22/20916 & 23/005

    Proposal Description
    The Proposed Mulilo Newcastle Wind Power WEF will consist of up to 45 turbines with a maximum hub height of up to 140 m and a rotor diameter of up to 200 m, with a total facility output of up to 200MW. The proposed activity will be located on the following land parcels: Portion 1 of Geelhoutboom Farm 3350, Remaining Extent (RE) of Bernard Farm 9447, RE of Cliffdale Farm 9439, RE of Spitskop Farm 16302, RE of Byron Farm 9448, and RE of Geelhoutboom Farm 3350. The expected WEF footprint will be up to 82 Ha after rehabilitation. Associated infrastructure will include an onsite substation, temporary laydown areas/construction yards, internal access roads (upgrade of existing roads and the construction of new roads), operations and maintenance (O&M) building.
    Author
    Sage.Wansell
    Last modified
    23/10/2023 - 18:00
    Reports
    Heritage Reports linked to this Case
    Palaeontological Specialist Reports Field Investigation Palaeontological Report: Proposed Mulilo Newcastle (Pty) Alan Smith
    Letter: Mulilo Newcastle Wind Power Field Investigation Paleontological Report Alan Smith download
    Palaeontological Specialist Reports Mulilo Newcastle Wind Power - Paleontological Impact Assessment Report Gavin Anderson, Alan Smith download
    Mulilo Newcastle Wind Power Gridlines HIA/PIA Gavin Anderson, Alan Smith download
    Heritage Impact Assessment Specialist Reports Mulilo Newcastle Wind Power Heritage Impact Assessment Gavin Anderson download
      Location
      Location
      Decisions, Comments + Permits
      Decision Date Type
      Final Decision Access Document
      Letter Access Document