Case Status
Proposal Description
Eyamakhosi Resources (Pty) Ltd. (the applicant) intends the development of 5.887ha (58870m2) coal storage facility site which will have following amenities and activities:
Construction of coal storage facility with a capacity design on the assumption that up to 3 grades of coal will be stored with 391 714t maximum stockholding;
Construction of coal storage yards of 3.8ha (38 000m2) at within 90, 91, and 159);
Development of facility offices and amenities within 1.1152ha (11 152m2) within Portion 88;
Development of trucks parking area within 0.9761ha (9671m2) at portion 89;
Construction of a 2% crossfall (V-Drain stormwater drainage) across the stockyard to allow for settlement and stormwater runoff into the pollution control dam (PCD), in order to provide for adequate stormwater handling and run-off drains linked to PCD;
To construct a PCD which will link to existing PCD and with capacity to handle approximately 208.89m3 of 1:10 & 1:50 year peak discharge from 60% hardened surface site area;
Construction of 12m high dust tamer wind fence as a perimeter fence and for windbreak purpose;
Installation of high concrete jersey barriers for partitioning the coal storage areas;
Construction of coal storage facility with a capacity design on the assumption that up to 3 grades of coal will be stored with 391 714t maximum stockholding;
Construction of coal storage yards of 3.8ha (38 000m2) at within 90, 91, and 159);
Development of facility offices and amenities within 1.1152ha (11 152m2) within Portion 88;
Development of trucks parking area within 0.9761ha (9671m2) at portion 89;
Construction of a 2% crossfall (V-Drain stormwater drainage) across the stockyard to allow for settlement and stormwater runoff into the pollution control dam (PCD), in order to provide for adequate stormwater handling and run-off drains linked to PCD;
To construct a PCD which will link to existing PCD and with capacity to handle approximately 208.89m3 of 1:10 & 1:50 year peak discharge from 60% hardened surface site area;
Construction of 12m high dust tamer wind fence as a perimeter fence and for windbreak purpose;
Installation of high concrete jersey barriers for partitioning the coal storage areas;