CaseDetails
    Summary
    Case ID
    20364
    Heritage Authority(s)
    SAHRA
    HFS
    Proposal Description
    The activity entails the development of an up to
    200MW photovoltaic solar facility and associated
    infrastructure on the Remaining Extent of Farm
    Vredesverdraf No. 427, situated within the
    Matjhabeng Local Municipal area of jurisdiction.
    The town of Henneman is located approximately 7
    km south‐east of the proposed development (refer
    to the attached locality map).
    The project entails the generation of up to 200MW
    electrical power through photovoltaic (PV) panels.
    The total footprint of the project will approximately
    be 318 hectares (including supporting
    infrastructure on site). The property on which the
    facility is to be constructed will be leased by Mulilo
    Renewable Project Development (Pty) Ltd from the
    property owner, for the lifespan of the project
    (minimum of 20 years).
    Author
    carli.steenkamp
    Last modified
    07/05/2024 - 14:43
    Reports
    Heritage Reports linked to this Case
    Archaeological Specialist Reports ARCHAEOLOGICAL SPECIALIST STUDY Jenna Lavin download
    Heritage Impact Assessment Specialist Reports HIA download
    Palaeontological Specialist Reports Palaeontological Impact Assessment Elize Butler download
    Official
      Location
      Location
      Decisions, Comments + Permits
      Decision Date Type
      Final Comment Access Document