CaseDetails
Summary
Case ID
20510
Case Status
Proposal Description
EIA and IWULA application as part of a mining right application (MP10374MR) for the opencast mining of Refractory Clays. This will involve the use of existing roads and the continuation of mining and the extension of an existing opencast pit. The IWULA will involve Section 21(g) (concurrent backfilling and stockpiling of product) and Section 21(j) (dewatering of the open pit) water uses. If any further water uses are required, they will be included in the application. The proposed project will be on the Remainder of the farm Roodepoort ...... and the proposed project will be ..... hectares.
Post date
31/07/2023 - 10:45
Last modified
23/10/2023 - 18:01
Reports
Palaeontological Specialist Reports | Palaeontological Impact Assessment | download | ||
AIA Phase 1 | Roodepoort Clay Quarry Heritage Impact Assessment | download |