Please be advised as follows:-
(1) The Institute was unable to consider the merits of the application as the work had already commenced, alternatively, has been completed;
(2) As a result, a permit cannot now be issued;
(3) Attention is drawn to the fact that failure to obtain a permit prior to the commencement of the work, was in contravention of the provisions of The KwaZulu-Natal Institute Act (5 of 2018), and as such is a criminal offence for which the culprit/s may be prosecuted;
(4) However, The Institute has decided to condone the failure to obtain a permit, as required, on condition that the work was conducted strictly in accordance with SELWYN NAIDOO drawing no 19/03/21SD, dated 19/03/21, received by the Institute on 17 February 2022, and that all the work shown on the application is completed within a calendar year of the date of this letter.
(5) Prior written approval from The Institute is required for any deviation to the approved plans.
(6) No legal action will be instituted in this instance and this letter serves as approval for the work shown on the approved drawings.
Applicable legislation
34(1)