CaseDetails
Summary
Case ID
21272
Case Status
Proposal Description
It is proposed that a photovoltaic solar facility and associated infrastructure will be built on Portion 1 and Remaining Extent of farm Nooitgedacht No. 11, Limpopo Province situated within the Thabazimbi Local Municipality area of jurisdiction. The town of Northam is located approximately 6 km North of the proposed development (refer to the attached locality maps). The project entails the generation of 200MW electrical power through photovoltaic (PV) panels. The total footprint of the project will be approximately 591 hectares (including supporting infrastructure on site). The property on which the facility is to be constructed will be leased by Platinum Solar Power Plant (RF) (Pty) Ltd from the property owner, for the lifespan of the project (minimum of 20 years).
Post date
17/10/2023 - 12:32
Last modified
19/07/2024 - 17:08
Reports
Heritage Impact Assessment Specialist Reports | HIA and PIA | download, download |
Official Use
Official
Case Officers
Location
Location
RoDs/Permits
Decisions, Comments + Permits
Decision Date | Type | |
---|---|---|
Final Comment | Access Document | |
Interim Comment | Access Document |