CaseDetails
    Summary
    Case ID
    21272
    Case Status
    Heritage Authority(s)
    SAHRA
    LIHRA
    Proposal Description
    It is proposed that a photovoltaic solar facility and associated infrastructure will be built on Portion 1 and Remaining Extent of farm Nooitgedacht No. 11, Limpopo Province situated within the Thabazimbi Local Municipality area of jurisdiction. The town of Northam is located approximately 6 km North of the proposed development (refer to the attached locality maps). The project entails the generation of 200MW electrical power through photovoltaic (PV) panels. The total footprint of the project will be approximately 591 hectares (including supporting infrastructure on site). The property on which the facility is to be constructed will be leased by Platinum Solar Power Plant (RF) (Pty) Ltd from the property owner, for the lifespan of the project (minimum of 20 years).
    Author
    carli.steenkamp
    Last modified
    19/07/2024 - 17:08
    Reports
    Heritage Reports linked to this Case
    Heritage Impact Assessment Specialist Reports HIA and PIA download, download
    Official
    Case Officers
    Action Tags
      Location
      Location
      Decisions, Comments + Permits
      Decision Date Type
      Final Comment Access Document
      Interim Comment Access Document