It is the intention of the South African National Roads Agency Soc Ltd (SANRAL) to improve the National Route N2 Section 33 from the Mpumalanga/KZN Border (Km 0.0) to Bloemendal (Km 34.0) in the Mpumalanga Province in the Mpumalanga Province. The scope of works will include the following:
• Widening of the existing road reserve as to facilitate the improvement from a 2-lane single carriageway to a 4-lane divided dual carriageway (2 lanes in each direction). The existing road is approximately 7.4m wide. The road surface width increases from 7.4m to 21.8 (10.9m per carriageway therefore 2x10.9m=21.8m). The asphalt surface will, therefore, widen by 14.4m. Adding the 8.6m wide grass median, the road formation will widen by about 23m over a distance of 34 km.
• Existing accesses to the N2 will be consolidated and intersections made safer.
• Increasing the road reserve width from 38m to 62m with associated land acquisition.
• Replacement, widening and/or capacity improvement of bridges, major and minor culverts.
• Stockpile areas and vegetation clearance outside road reserve in excess of one hectare.
• The construction will take approximately 42 months to complete.
• Widening of the existing road reserve as to facilitate the improvement from a 2-lane single carriageway to a 4-lane divided dual carriageway (2 lanes in each direction). The existing road is approximately 7.4m wide. The road surface width increases from 7.4m to 21.8 (10.9m per carriageway therefore 2x10.9m=21.8m). The asphalt surface will, therefore, widen by 14.4m. Adding the 8.6m wide grass median, the road formation will widen by about 23m over a distance of 34 km.
• Existing accesses to the N2 will be consolidated and intersections made safer.
• Increasing the road reserve width from 38m to 62m with associated land acquisition.
• Replacement, widening and/or capacity improvement of bridges, major and minor culverts.
• Stockpile areas and vegetation clearance outside road reserve in excess of one hectare.
• The construction will take approximately 42 months to complete.
Post date
31/10/2023 - 15:26
Last modified
06/11/2023 - 08:33
Reports
AIA Phase 1 | Cultural heritage impact assessment for THE PLANNED IMPROVEMENT OF THE NATIONAL ROUTE N2, KM 0,0 (KWAZULU-NATAL BORDER) TO KM 34 (BLOEMENDAL) | Johnny van Schalkwyk | download |
Official Use
Official
Case Officers