CaseDetails
    Summary
    Case ID
    21525
    Case Status
    Heritage Authority(s)
    SAHRA
    LIHRA
    Official Reference

    21525

    Proposal Description
    Mutsho Power (Pty) Ltd is proposing the establishment of Electrical Grid Infrastructure comprising a 132kV onsite substation (Eskom portion), and a 132kV double circuit overhead power line from the onsite substation to the Nzhelele Substation to enable the connection of up to four (4) authorised Solar PV Energy Facilities to the national grid for the evacuation of the generated power. It is the developer’s intention to develop the projects in a phased approach (i.e., 100MW at a time).
    Province(s): Limpopo
    Author
    savannahsa
    Last modified
    11/01/2024 - 16:39
    Reports
    Heritage Reports linked to this Case
    HIA Phase 1 HIA: Mutsho Grid Connection Jenna Lavin download