CaseDetails
Summary
Case ID
21592
Case Status
Proposal Description
PHASE 1 HIA FOR THE PROPOSED CONSTRUCTION OF THE HELUSHE BRIDGE, NEAR LADY FRERE, CHRIS HANI DISTRICT MUNICIPALITY WITHIN THE EMALAHLENI LOCAL MUNICIPALITY, EASTERN CAPE PROVINCE
Post date
28/11/2023 - 11:44
Last modified
28/11/2023 - 11:44
Reports
PHASE 1 HIA FOR THE CONSTRUCTION OF THE HELUSHE BRIDGE, EASTERN CAPE | Sky-Lee Fairhurst | download | ||
PIA PROPOSED CONSTRUCTION OF THE HELUSHE BRIDGE IN THE EASTERN CAPE PROVINCE | Elize Butler | download | ||
HIA Phase 1 | REVISED PHASE 1 HIA FOR THE CONSTRUCTION OF THE HELUSHE BRIDGE, EASTERN CAPE | Sky-Lee Fairhurst, Heidi Fivaz, Elize Butler, Jan Engelbrecht | download | |
REVISED PIA FOR THE PROPOSED CONSTRUCTION OF THE HELUSHE BRIDGE IN THE EASTERN CAPE PROVINCE | Elize Butler | download |