    Proposal Description
    The proposed interventions to the long barn involves the adaptive re-use of the building. The ground level will be used as office space either side of the central stables portion of the building. The stables portion is identified as general use and will be left as is, apart from repair and maintenance work. The loft area will be broken up into four office spaces.
    Physical interventions include the new external openings making use of the irregular pattern of existing openings. Windows and doors are to be replaced with simple, glazed, steel-framed elements, which are recessed into the wall to minimise the visual impact of the aluminium frames and to emphasise the concept of wall punctures. The proposals make provision for the structural repair of the end gables and the addition of exterior masonry staircases to the loft space. The input of the structural engineer on the structural repair of the end gables makes provision for masonry external staircases to provide additional structural support.
    Inventory Reference
    Author
    sarah.winter
    Last modified
    19/08/2024 - 10:24
    Reports
    Heritage Reports linked to this Case
    Boschendal Nieuwedorp FE 11 Landscape Intent and Landscape Plan download
    DHF Comment download
    Built Environment and Cultural Landscapes NIEUWEDORP LONG BARN ALTERATIONS AND ADDITIONS Sarah Winter download
    Notification of I&APs download
    SIG Comment download
    Official
    Case Officers
      Decisions, Comments + Permits
      Decision Date Type
      Permit Access Document