CaseDetails
Summary
Case ID
21709
Case Status
Proposal Description
FS Fossil (Pty) Ltd (hereafter the Applicant) is proposing the development of a solar energy facility (SEF) and associated infrastructure on a site located approximately 77 km north of Loeriesfontein within the Hantam Municipality, in the Northern Cape. The FS Fossil Photovoltaic (PV) SEF footprint is approximately 722 hectares (ha) and will be located on Portion 2 of the Farm Karree Doorn Pan 214. The proposed SEF will have a generation capacity of up to 450MW which will feed into the National Grid. This report comprises the Draft Scoping Report (DSR) for the proposed development of the FS Fossil PV SEF.
The FS Fossil PV SEF will consist of PV panels, with a generation capacity of 450MW, depending on the available technology at the time. Additional ancillary infrastructure to the SEF would include underground and above-ground cabling between project components, onsite substation/s, Battery Energy Storage Systems (BESS), mounting systems to support the PV panels, internal/ access roads (up to 10 m in width) linking the PV panels and other infrastructure on the site, and permanent workshop area and office for control, maintenance and storage. As far as possible, existing roads will be utilised and upgraded (where needed) with the relevant stormwater infrastructure and gates constructed as required. The perimeter of the proposed SEF may be enclosed with suitable fencing. A formal laydown area for the construction period, containing a temporary maintenance and storage building along with a guard cabin will also be established.
Province(s): Northern Cape
The FS Fossil PV SEF will consist of PV panels, with a generation capacity of 450MW, depending on the available technology at the time. Additional ancillary infrastructure to the SEF would include underground and above-ground cabling between project components, onsite substation/s, Battery Energy Storage Systems (BESS), mounting systems to support the PV panels, internal/ access roads (up to 10 m in width) linking the PV panels and other infrastructure on the site, and permanent workshop area and office for control, maintenance and storage. As far as possible, existing roads will be utilised and upgraded (where needed) with the relevant stormwater infrastructure and gates constructed as required. The perimeter of the proposed SEF may be enclosed with suitable fencing. A formal laydown area for the construction period, containing a temporary maintenance and storage building along with a guard cabin will also be established.
Province(s): Northern Cape
Post date
12/12/2023 - 14:53
Last modified
16/10/2024 - 15:52
Reports
Heritage Impact Assessment Specialist Reports | HIA Fossil SEF | Lara Kraljevic | download |
Official Use
Official
Case Officers
Location
Location
RoDs/Permits
Decisions, Comments + Permits
Decision Date | Type | |
---|---|---|
Final Comment | Access Document | |
Final Comment | Access Document | |
Interim Comment | Access Document |