CaseDetails
    Summary
    Case ID
    21929
    Case Status
    Heritage Authority(s)
    ECPHRA
    Proposal Description
    Indwe Environmental Consulting have been appointed by HSC Consulting, on behalf of Mnquma Local Municipality, to conduct an Environmental Impact Assessment for the proposed upgrade to a low-lying culvert bridge in Ngqamakhwe, Eastern Cape. The current culvert-bridge is an Earth filled bridge with a 600mm diameter pipe in line with the watercourse conveying stormwater discharge. The upgrade would include the installation of a formalised two-culvert bridge and lifting the bridge approaches slightly to accommodate an engineered bridge.
    The culvert will be located along a connecting road between two parts of the town.
    The culvert will be 10m x 8m in size.
    Author
    gavin.anderson
    Last modified
    09/02/2024 - 08:16
    Reports
    Heritage Reports linked to this Case
    HIA Phase 1 Ngqamakhwe Stormwater Bridge Gavin Anderson, Gideon Groenewald download