CaseDetails
    Summary
    Case ID
    22046
    Case Status
    Heritage Authority(s)
    SAHRA
    NWPHRA
    Proposal Description
    The Applicant, Aalwyn Energy Facility (RF) (Pty) Ltd, proposes the installation and establishment of the Aalwyn Battery Energy Storage System (BESS) and Associated Infrastructure to accommodate the storage of excess energy/electricity during low demand time periods that will evacuate the stored electricity into the national grid, via the Mercury Main Transmission Substation (MTS), during high demand/peak periods for electricity use. The associated infrastructure includes an on-site substation, operation and maintenance
    buildings, fencing and other auxiliary infrastructure. The Aalwyn BESS will connect to either 132 kV Impofu Substation (Grid Connection Option 1), or the 400 / 132 kV Ngwedi Main Transmission Substation (MTS) (Grid Connection Option 2). The capacity of the BESS will be up to 100 MW and is proposed to be BID as part of the Department of Mineral Resources and Energy (DMRE) BID Window 2 for the Battery Energy Storage Independent Power Producers Procurement Programme (BESIPPPP). The development is proposed on on the Remaining Extent of Portion 12 of the Farm Elandsfontein 102, Registration Division JQ, situated within the Rustenburg Local Municipality, Bojanala Platinum District Municipality.
    Province(s): North West
    Author
    pgs.heritage
    Last modified
    20/03/2024 - 17:02
    Reports
    Heritage Reports linked to this Case
    HIA Phase 1 HIA for the Aalwyn Battery Energy Storage System and Associated Infrastructure Jessica Angel, Wouter Fourie download
    PIA Desktop PDA for the Aalwyn Battery Energy Storage System and Associated Infrastructure Elize Butler download
    Official
    Case Officers
      Location
      Location
      Decisions, Comments + Permits
      Decision Date Type
      Final Comment Access Document