CaseDetails
Summary
Case ID
22051
Case Status
Proposal Description
Sandpan Energy Facility (RF) (Pty) Ltd, proposes the installation and establishment of the Sandpan Battery Energy Storage System (BESS) and Associated Infrastructure to accommodate the storage of excess energy/electricity during low demand time periods that will evacuate the stored electricity into the national grid, via the existing Eskom 400/88 kV Marang Main Transmission Substation (MTS), during high demand/peak periods for electricity use.
The associated infrastructure includes an on-site substation, overhead power line, roads, operation and maintenance buildings, fencing and other auxiliary infrastructure. The capacity of the BESS will be up to 100 MW and is proposed to be BID as part of the Department of Mineral Resources and Energy (DMRE) BID Window 2 for the Battery Energy Storage Independent Power Producers Procurement Programme (BESIPPPP). The development is proposed on the Remaining Extent of Portion 52 of the farm Waterkloof No. 305, Registration Division JQ, situated within the Rustenburg Local Municipality, Bojanala Platinum District Municipality within the North West Province.
Province(s): North West
The associated infrastructure includes an on-site substation, overhead power line, roads, operation and maintenance buildings, fencing and other auxiliary infrastructure. The capacity of the BESS will be up to 100 MW and is proposed to be BID as part of the Department of Mineral Resources and Energy (DMRE) BID Window 2 for the Battery Energy Storage Independent Power Producers Procurement Programme (BESIPPPP). The development is proposed on the Remaining Extent of Portion 52 of the farm Waterkloof No. 305, Registration Division JQ, situated within the Rustenburg Local Municipality, Bojanala Platinum District Municipality within the North West Province.
Province(s): North West
Post date
26/02/2024 - 16:51
Last modified
17/04/2024 - 14:46
Reports
Heritage Impact Assessment Specialist Reports | HIA for the Sanpan Battery Energy Storage System and Associated Infrastructure | Jessica Angel, Wouter Fourie | download | |
PIA Desktop | PDA for the Sandpan Battery Energy Storage System and Associated Infrastructure | Elize Butler | download |
Official Use
Official
Case Officers
Location
Location
RoDs/Permits
Decisions, Comments + Permits
Decision Date | Type | |
---|---|---|
Final Comment | Access Document |