CaseDetails
    Summary
    Case ID
    22123
    Case Status
    Heritage Authority(s)
    SAHRA
    Proposal Description
    The expansion proposal includes the following –
    Increase production by 150 tons phase 1 / 1.75 ha (wet weight per annum)
    Increase production by 150 tons phase 2 / 1.75 ha (wet weight per annum)
    Footprint of the new production area = 1.75 ha + 1.75 ha = 3.5 ha / 300 tons
    Construction of lined reservoir for containment of sea water for use during load-shedding – 410 000 m3 / 2 ha (no dam wall)
    Solar – 4 ha area / 4 MW
    Additional pipelines to new production area to join into existing network – 4 lines @ 600 m x 500 mm, delivering 1600 m3 / hour – located alongside existing pipeline within disturbed area
    Increase pumphouse by 40m²
    The total expansion will comprise 9.5ha with an increased production output by 300 tons wet weight per annum.
    Province(s): Western Cape
    Author
    jonathan.kaplan
    Last modified
    21/05/2025 - 15:58
    Reports
    Heritage Reports linked to this Case
    HIA Phase 1 Proposed Romansbaai Abalone Farm, Gansbaai Jonathan Kaplan download, download, download, download
      Location
      Location
      Decisions, Comments + Permits
      Decision Date Type
      Final Comment Access Document
      Interim Comment Access Document