RC Stillfontein Solar 2 (Pty) Ltd (the ‘Applicant’), a subsidiary of Cainmani (Pty) Ltd (the ‘Developer’), plans to develop, construct and operate a Solar Photovoltaic Facility (SPVF) approximately 18 km southeast of Klerksdorp, adjacent to the town of Stillfontein within the North West Province of South Africa. The project site is situated in the City of Matlosana Local Municipality (LM) which forms part of the Dr Kenneth Kaunda District Municipality (DM). The proposed 300MW Stillfontein 2 SPVF is situated within the Klerksdorp Renewable Energy Development Zone (REDZ10) which was promulgated in GN R. 840 for large scale wind and solar photovoltaic energy facilities.
The proposed Stillfontein 2 SPVF will consist of up to 500 000 solar panels, with a total facility output of up to 300MW. The SPVF will also include a Battery Energy Storage System (BESS), an internal collector substation (SS), a 132kV Overhead Line (OHL) of up to 13km in length (two alternatives are being considered) to connect the SPVF to the existing Eskom infrastructure (Hermes Substation) to the south. Ancillary infrastructure includes temporary and permanent laydown areas, access roads, internal roads and operation and a maintenance (O&M) building. The facility will cover an area of up to 394ha with construction footprint of up to 38ha, rehabilitated to an operational footprint of up to 30ha.
Province(s): North West
The proposed Stillfontein 2 SPVF will consist of up to 500 000 solar panels, with a total facility output of up to 300MW. The SPVF will also include a Battery Energy Storage System (BESS), an internal collector substation (SS), a 132kV Overhead Line (OHL) of up to 13km in length (two alternatives are being considered) to connect the SPVF to the existing Eskom infrastructure (Hermes Substation) to the south. Ancillary infrastructure includes temporary and permanent laydown areas, access roads, internal roads and operation and a maintenance (O&M) building. The facility will cover an area of up to 394ha with construction footprint of up to 38ha, rehabilitated to an operational footprint of up to 30ha.
Province(s): North West
Post date
08/03/2024 - 11:04
Last modified
09/04/2024 - 17:11
Reports
Heritage Impact Assessment Specialist Reports | Stillfontein 2 SPVF HIA | Nelius Kruger | download | |
Palaeontological Specialist Reports | Stillfontein 2 SPVF PIA | Elize Butler | download |
Official Use
Official
Case Officers
Location
Location
RoDs/Permits
Decisions, Comments + Permits
Decision Date | Type | |
---|---|---|
Final Comment | Access Document | |
Interim Comment | Access Document |