CaseDetails
Summary
Case ID
22187
Case Status
Proposal Description
The applicant wishes to develop a Solar Photovoltaic (PV) Energy Generation Facility at the Lydenberg Smelter. The generation capacity will be up to 200 megawatts. The electricity generated from the facility will be used at the Lydenburg smelter or will be wheeled to other Glencore operations. Other possible infrastructure will include an on-site substation/ switching station, access roads, battery energy storage system and an 88kV power line. The proposed project is located on Portion 143 of Farm 30 Potloodspruit, Portions 114, 457 and 471 of Farm 31 Townlands of Lydenburg, Portion 1 of Lydenburg Smelter Erf 6099, Lydenburg Smelter Erf 2540 and Lydenburg Smelter Erf 2541 within the Thaba Chweu Local Municipality, Mpumalanga. The site is located approximately 2km north of Lydenburg town central area. The centre point of the site is 25° 4'0.26"S; 30°28’9.47”E.
Province(s): Mpumalanga
Province(s): Mpumalanga
Post date
11/03/2024 - 08:27
Last modified
15/11/2024 - 14:42
Reports
Heritage Impact Assessment Specialist Reports | Glencore Lydenburg PV - HIA | Jessica Angel | download | |
PIA Desktop | Palaeontological Desktop Assessment | Elize Butler | download |
Official Use
Official
Case Officers
Location
Location
RoDs/Permits
Decisions, Comments + Permits
Decision Date | Type | |
---|---|---|
Final Comment | Access Document | |
Interim Comment | Access Document |